Abstract
The data basis for a Total Site study is only valid for a static snapshot of the whole industry Site. Changes to single process units throughout the design phase of new industrial solutions as well as subsequent process modifications to existing plants necessitate an actualization of the Total Site analysis. Previously identified potentials to increase the energy efficiency may have become outdated or infeasible. As a first step in the development of an Energy Integration Manager, a conceptual approach for the implementation of an interface to an existing heat exchanger network (HEN) synthesis tool is proposed. Certain improvements to the HEN synthesis tool according to heuristic rules are described for enabling a suitable workflow.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have