Abstract

The wide application of ultra high voltage(UHV) transmission lines solves the problem of unbalanced distribution between energy and consumption. However, high risk is also generated as the long distance connection between areas. A new emergency control of generation shedding scheme is proposed, which takes into account both the selection principle of generation shedding locations and the boundary amount of shedding. The shedding method is based on simulation of fault scenarios which is easy to be realized to obtain the optimal scheme of emergency control of power grid. The new method has also been analyzed in a simulation based on an actual UHV project of China.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.