Abstract
Exploration activities nickel (Ni) which is one of the stages, is where the exploratory drilling work efficiency is one of the main factors that can describe how good a job has been done. The purpose of this study is to analyze the efficiency of exploration drilling. This research method is done by direct observation in the field. The data that was obtained was a record time of any activities during the working day in the form of exploration drilling activity, inserting the inner tube in the core barrel, an empty lap, then taking out further drilling in the core barrel inner tube, prepare the inner tube, add pipes, and re-inserting the inner tube core barrel. There are other activities that the problems of the inner tube not landing. The inner tube can not rise, smoothing supplies drilling, pulling out the pipe, moving the drilling tool and equipment, preparation of drilling, transportation, accessibility, preparatory work crew, safety talk/meeting, checking tool, refueling, wait for dozer, crew return preparations, waiting for a supervisor/geologist, waiting for the crew, weather problems, rest, waiting to go home, repair, and water issues. This study obtained an efficiency increase of 44.43% in drilling work. Concluded the drilling work efficiency is still below the working efficiency standards applied by the company by 50%.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Engineering Science and Technology Applications
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.