Abstract

Dedicating two lanes and passenger platforms to transit typically requires taking the same space away from general use. This may affect public support. This paper proposes efficient geometric configurations for a two-dedicated-lane BRT or light rail system that requires a minimum amount of right-of-way along a busy commute arterial. In many current busy commute corridors, a significant part of the street median is underused or unused for traffic purposes. The efficiency is achieved mainly by using the street median between a left-turn lane and its counterpart located at the intersection on the other end of the same street section and slanting part of the two dedicated lanes with respect to the longitudinal direction of the street. Instead of the three-lane or even four-lane conversion required of the prevailing configurations, the proposed configurations require conversion of only two lanes from general use, even for a section equipped with passenger platforms.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call