Abstract
A cost estimating model is developed for light rail transit (LRT) and bus rapid transit (BRT) systems to better aid transportation planners and decision makers in the selection process. In evaluating transit systems, cost estimating has always been a major consideration. Without an applicable cost estimating model or methodology, the decision on the choice between LRT and BRT would cause significant controversy and difficulty in the early corridor planning stage. The model developed in this paper can be applied to estimate costs and compare the LRT and BRT systems that operate on various right-of-way categories, alignment configurations, and different given transit demand volumes. An example and comparative analyses illustrate how the model can be applied in real-world situations.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.