Abstract
In this paper, an improved DRP method to schedule multi-echelon distribution network is proposed such that order-quantities and order points are dynamically obtained to meet the demand in just in time concept and minimize the out-of-stock probability. The order scheduling method reflects the dynamic characteristics of inventory level changes in the regional distribution centers and the central distribution center. The experiment has been done with various demand distributions, forecast error distributions and lead times. The proposed method was compared with the traditional DRP-based scheduling methods which use different lot-sizing and order point decision techniques. From the result, it is found that the proposed heuristic method yields preferable lot-sizing schedules.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.