Abstract
In this paper, a ranking of the best locations to install remote control transformation centers (RCTCs) in distribution power lines is obtained by using the Shapley value of a cooperative game. The characteristic function of the game is based on both supply quality and economic indicators, which are relevant aspects regarding the operation and viability of electricity corporations. An academic example based on real data taken from a Spanish electricity company is considered to illustrate the feasibility of the proposed approach.
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have