Abstract
Abstract The public sector in Germany lags behind the economy in terms of projectification, i.e., the prevalence of projects and experience in applying project management. This has significant implications for realizing complex infrastructure projects in which the public sector is involved as one of the main actors. Nowadays, projectification represents a particular way of thinking about how to embrace a series of dynamic and challenging changes, design them, and implement them effectively for the benefit of society. A quantitative study of projectification in society in Germany was the starting point for our research, the results of which we compared with data from earlier studies of projectification in the economy. Using an interpretative case study drawing on insights from the Berlin Airport, we analyzed the impact of lagging projectification in the public sector in Germany on realizing infrastructure projects to propose suitable approaches. The results of this case study reveal significant effects of lagging projectification in the public sector of Germany on realizing infrastructure projects. In the case of the Berlin BER Airport, an inadequate governance system led to a 9-year delay in the completion date and a 250% overrun of costs directly attributable to the project. This could have been avoided by involving the private construction industry more collaboratively, by building on previous experiences gained, and by a more cooperative way of project planning and implementation. To guide future research, hypotheses are derived that can be used to analyze the underlying problem in greater depth and to derive recommendations for action.
Highlights
The public sector in Germany lags behind the economy in terms of projectification, i.e., the prevalence of projects and experience in applying project management
In order to answer our research question regarding the effects of lagging projectification in the public sector on realizing infrastructure projects, we focused on a quantitative survey on the projectification of society in Germany and compared the results with a previously conducted survey on the projectification of the German economy
We show the different levels of projectification in the economy and the public sector in Germany with its evolution; we provide an analysis of causes and potential consequences of lagging projectification in the public sector on realizing infrastructure projects, and reflect upon this using the example of the Berlin BER Airport
Summary
Abstract: The public sector in Germany lags behind the economy in terms of projectification, i.e., the prevalence of projects and experience in applying project management. This has significant implications for realizing complex infrastructure projects in which the public sector is involved as one of the main actors. In the case of the Berlin BER Airport, an inadequate governance system led to a 9-year delay in the completion date and a 250% overrun of costs directly attributable to the project This could have been avoided by involving the private construction industry more collaboratively, by building on previous experiences gained, and by a more cooperative way of project planning and implementation. Hypotheses are derived that can be used to analyze the underlying problem in greater depth and to derive recommendations for action
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Organization, Technology and Management in Construction: an International Journal
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.