Abstract

The China Fusion Engineering Test Reactor (CFETR) is under design, which aims to bridge the gaps between ITER and the future fusion power plant. The neutron wall loading (NWL) depends on the neutron source distribution, which depends on the density and temperature profiles. In this paper, we calculate the NWL of CFETR and study the effects of density and temperature profiles on the NWL distribution along the first wall. Our calculations show that for a 200 MW fusion power, the maximum NWL is at the outer midplane and the vaule is about 0.4 MW m−2. The density and temperature profiles have little effect on the NWL distribution. The value of NWL is determined by the total fusion power.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.