Abstract

Performance of a fed batch moving-bed reactor system arranged in anaerobic (B1)–anoxic (B2)–aerobic (B3) mode was investigated using cycle time (18–36 h), gradual fill time (total 5–18.5 h; B1: 1–3.7 h; B2 and B3: 2–7.4 h each) and instantaneous fill time as variable parameters. During cycle time variation, total hydraulic retention time changed from 4.5 to 9 days (B1: 2.25–4.5 days; B2 and B3: 1.13–2.25 days each). Synthetic wastewater contained phenol (1500 mg/l), thiocyanate (SCN− 800 mg/l at gradual fill and 100 mg/l at instantaneous fill) and ammonia ( 500 mg/l). Phenol and chemical oxygen demand (COD) removals in B1 increased with increase in cycle time and gradual shorter filling showed higher performance than gradual long filling and instantaneous filling. In B2, simultaneous removals of phenol, SCN, COD and -N were achieved and effects of cycle time and fill times were not profound. In B3, removal efficiency increased with increase in both cycle time and gradual fill time. The minimum cycle time of 30 h and total hydraulic retention time of 7.5 days and total fill time of 12.5 h were recommended. A modified Stover–Kincannon model showed the highest correlation for removal of substrates in B1, B2 and B3.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.