Abstract

At present, there are few evaluations on the effectiveness of the quality management system of the construction engineering testing laboratory in our country. According to the quality management system of the quality management system, a two-stage evaluation structure model of the quality management system effectiveness is established according to the Evaluation criteria for the qualification of the Laboratory. A comprehensive evaluation of the quality management system of a building engineering testing laboratory in Tangshan City was carried out by using triangular fuzzy number analytic hierarchy process (AHP), and the evaluation results were obtained in accordance with the actual situation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.