Abstract
Based on the loading test of a jet pile composite foundation in loess ravine area, the relationship between the pile capacity and its length was researched. The effective length of the pile and the suitable range of pile length in this region were given in this paper. In the end, it indicates that only the magnitude of current can’t be use to control the length of the pile at construction.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have