Abstract

The present study attempts to identify the impact of effective implementation on construction projects in Sudan achievement of their objectives, to identify the obstacles that face their implementation in the time and at the cost specified, to find out the various factors that should be taken into account when establishing these projects and to highlight the scientific methods of managing major construction projects in Sudan in order to reach management methods that help controlling projects positively and contributes to achieving their objectives effectively. The study adopted the historical approach, the deductive approach, and the analytical descriptive approach. The study aimed to determine the defects in major construction project implementation, to investigate their causes and to clarify scientific solutions to them. The most important hypotheses of the study: There is a statistically significant relationship between the effectiveness of project implementation and the achievement of their objectives. The study concluded with several findings, the most important: The frequent modifications during the implementation led to increasing the project cost. The study recommended the following: Attention should be given to project implementation planning, including the social and economical feasibility study and the adoption of scientific methods to ensure the project's success.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call