Abstract

The present paper addresses the dynamic scheduling problem of smart products in a Flexible Manufacturing System (FMS). Unrelated machines, multiple product families, operation setups and dynamic job arrivals are considered. The goal is to propose a dynamic selection of smart products scheduling rules enriched with a context perception capability that is optimized using a hyper heuristic. A proof of concept with preliminary results is given.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.