Abstract
Flexible manufacturing system (FMS) is described as a set of computerised numerical controlled machines, input–output buffers interconnected by automated material handling devices. This paper develops a bi-objective operation allocation and material handling equipment selection problem in FMS with the aim of minimising the machine operation, material handling and machine setup costs and maximising the machine utilisation. The proposed model is solved by a modified chaotic ant swarm simulation based optimisation (CAS2O) while applying pre-selection and discrete recombination operators is surveyed a capable method to simulate different experiments of FMS problems. A test problem is selected from the literature to evaluate the performance of the proposed approach. The results validate the effectiveness of the proposed method to solve the FMS scheduling problem.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.