Abstract
The distributed generation planning (DGP) in distribution system is affected with load models. Further, The size of distributed generation is also affected with voltage step constraints. In previous works, the effects of load models and voltage step constraint, in distributed generation planning (DGP), have not been studied together by the researchers so for. In this paper, voltage step constraint, along with usual constraints i.e. bus voltage limits and line capacity limits, and basic load models have been considered in DGP. The study has been carried out in 38 bus test system using incremental power flow and exhaustive search method. The results show that optimal location and size along with intake power from grid are significantly affected by voltage step constraint and load models.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.