Abstract

The effect of load models on distributed generation (DG) planning in distribution system is investigated in this work. It is shown that load models can significantly affect the DG planning. Normally a constant power (real and reactive) load model is assumed in most of the studies. Such assumptions may lead to inconsistent and misleading results about deferral values, loss reduction, payback period, and other subsequent calculations. It has been demonstrated that DG planning based on such assumptions would not be effective after implementation. It is shown that load models can significantly affect the optimal location and sizing of DG resources in distribution systems. A comparative study of real and reactive power loss, real and reactive power intake at the main substation and MVA support provided by installing DG resources for different type of loads models has been performed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.