Abstract

There are many strongly developed karsts in South China, which bring great uncertainty to the construction stability of underground projects. This paper takes the deep foundation pit project of a station in a sandy soil area as the background, simulates the deep foundation pit excavation process based on finite element software, and comparatively analyzes the influence of the existence of karst holes on the foundation pit support structure. The results show that the effective treatment of solution holes in the process of foundation pit excavation can reduce the risk of surface settlement around the foundation pit but has less influence on the lateral displacement of the foundation pit support structure. The cavity grouting reinforcement technology is also introduced in detail in the paper, which can provide a reference for the reinforcement of deep foundation pit projects in sandy soil stratum containing strong development of large cavities.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.