Abstract

In effort to minimize project failures (time delay) arising from due to supplier selection errors that have an impact on low performance and low potential for successful projects. This study aims to find out how strong the influence of supplier selection is right and correlates with good performance so thatthe project's success can be achieved. By using the SEM (Structural Equation Modeling) method in a PLS (Partial Least Square) application by examining the relationship between factors on the criteria of quality supplier selection that is expected to have an impact on the performance of a good supplier, and later can be related to the potential success of the project. Test results on Bootstrapping obtained the value of T-Value and P-Value in the 1st Hypothesis, namely, T-Statistics 0.829 and P-Value 0.407, the supplier performance variable (X2) did not affect the project success variable (Y1). The second hypothesis is, with a T-Statistical value of 2.094 and a P-Value of 0.037, the Supplier Selection (X1) has a significant effect on the project success variable (Y1). The third hypothesis is, with a T-Statistic value of 8.306 and a value of P-Value 0,000, Supplier Selection (X1) has a significant effect on the Supplier Performance variable (X2).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.