Abstract

Three horizontal subsurface flow (HSF) pilot-scale constructed wetland (CW) units operated for 3years treating municipal wastewater originating from a university campus. The main objective of the study was the evaluation of the performance of these systems under several operational, design, and climatic conditions. Several parameters and factors were investigated, including the influence of temperature, vegetation, and hydraulic residence time. The results were compared to those of a previous study conducted in the same pilot-scale units and under the same operational conditions where synthetic municipal wastewater was used. Results show the satisfying overall performance of the CW units. Performance seems to be influenced by vegetation, temperature, and hydraulic residence time (HRT). The planted units produced better results than the unplanted one while, generally, all units operated better under warmer conditions. In addition, longer HRTs contributed to higher removal efficiencies. Finally, the systems showed higher removal efficiencies in the previous study (synthetic wastewater) regarding organic matter removal, while for the other pollutants, the present study (real wastewater) showed higher or comparable performance in most cases and especially in the planted units. The study also shows the overall good, continuous, and long-term operation of CW systems, since these systems operate for about 13years.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call