Abstract
Water leakage was reported from one of the superheater tubes of boiler during operation. The power plant is a part of copper ore smelting and refining industry. It was observed, that the leakage took place through cracked region of the tube, which was severely damaged due to chemical attack. Damage occurred due to reaction between flue gas and outer wall of super heater tube. Inefficient treatment of flue gas resulted in retention of metal particles, SO2 gas and particulate within the same in substantial concentration. When the same flue gas was used in boiler, SO2 reacted with tube surface at elevated temperature. The incident lead to wall thinning and deep pit formation over tube surface. Metal particles was fused, adhered to tube surface and triggered secondary cracking during operation. Gradual wall thinning, increment in pit size and crack propagation through thickness resulted in ultimate failure of tube material.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.