Abstract

PurposeThis paper aims to communicate the relevant management model with optimal performance in the collection of construction resources (human, non-human), supervision of workers and activities in the development of adequate and quality school infrastructure facilities.Design/methodology/approachThe study employed a mixed methods research approach in collecting and analysing research findings. Semi-structured face-to-face interviews and questionnaires which consisted of closed questions were the data collection tools. Numerical data collected were processed and analysed by using quantitative methods and techniques such as descriptive analysis, whereas text data were subjected to content analysis.FindingsThe findings revealed that the Post-New Public Management (PNPM) is relevant in the collection of construction resources and suitable for the supervision of workers and tasks towards the development of adequate and quality school infrastructure facilities. Based on the evidence generated, the PNPM model was recommended to be adapted to collection of construction resources and supervision of workers and activities.Originality/valueThis paper highlights the need for construction committees and other education policy implementers to adapt a relevant management model in realising optimal performance in the development of adequate and quality school infrastructure facilities.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call