Abstract

In part I of this study, control structures were proposed for different operational regions of a post-combustion CO2 capturing process using the top-down steady-state economic part of the plantwide procedure. In the current study, the bottom-up part of the complete procedure is considered. For this purpose, dynamic simulation is used to validate the proposed control structures. Different control configurations using decentralized controllers and model predictive control (MPC) are considered. At the end, a simple control configuration is proposed which keeps the process close to the optimum in all operational regions without the need for switching the control loops.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.