Abstract

AbstractAs public utility owners face increased budget constraints and greater expectations, alternative project delivery methods will increasingly be used to fast track projects, reduce costs, promote innovation, and ensure proper performance for water and wastewater facilities. The goals of public utility owners and U.S. federal tax regulations suggest why design-build-operate (DBO) projects have been selected over other procurement processes. The research reported in this paper contributes to the body of knowledge and benefits industry practitioners, by identifying tax regulations and best practices that when jointly considered improve the project delivery selection process, while enhancing risk-mitigation efforts on DBO water and wastewater projects. A procurement selection process using multiple-criteria decision and financial risk analyses is presented to select the most economically sustainable delivery method given each project’s characteristics. A present value analysis establishes a range of val...

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.