Abstract

A procedure for determining economic schedules of generation for use in planning studies involving large systems is presented. These schedules are achieved by combining a load flow and dispatching routine with the calculation of incremental losses. The predominate feature is the technique used to calculate the incremental losses. Whereas previous methods required the inverse of the nodal admittance matrix for the inclusion of system losses, this operation has been replaced with a linear iterative scheme. As a result, this procedure is particularly suited to large systems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.