Abstract
We present inventory models to schedule an imperfect manufacturing process where a proportion of the items are defective. The proportion is known; and the production is followed by a 100% inspection. The manufacturer implements a rework strategy to rectify the defective items. Since the rework can be implemented on a number of plans, a flexible rework rate is presented. The flexible rework offers the manufacturer the selection of the rework rate, which can be different from the production rate, and also the selection of the rework process itself, which can be asynchronous and synchronous. Under the asynchronous rework, the defective items are kept until the completion of the production lot; while, under the synchronous rework, the defective items are reworked as soon as they are produced. A linear rework cost function of the rework rate is assumed. The objective of this paper is to develop mathematical models to determine the optimal lot sizes and backorders for different assumptions about the rework rate and the rework process. It has been proven that the rework strategy and the rework rate influence the lot size and the backorder, especially for large values of the defective proportion.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.