Abstract

Abstract Frequently optimizations of chemical processes are presented in terms of the maximization of fractional conversion, but the primary concern when implementing a process is much more likely to be the economic viability. These are distinct optima that tend to occur at very different points. It was the purpose of this paper to integrate leaching experimental data with cost analysis to arrive upon economically optimized leaching conditions for the recovery of rare earth elements from phosphogypsum, a water phosphate byproduct. The variables under consideration were the number of leaching reactors and the residence time of each reactor. The modeling results indicated that the optimum residence time was 270 minutes and that the optimum number of stages was one.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.