Abstract

In this paper, the ELD problem is resolved via ABC (Artificial BEE Colony) technique. The major goal of this study is to use the IDO method to present very efficient & reliable approach for solving ED problem in Power system. The suggested approach is used to solve a variety of non-convex ED issues, including banned operating zones with ramp rate constraints. This problem is described as an optimization of the objective function and minimization of the overall operating cost while gratifying all allied constraints, accompanied by the lowest down & up time limitations, startup cost, and spinning reserve. A six generators scheduling problem is discussed, along with its formulation, representation, and simulation result.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call