Abstract

To increase the efficiency of a three-circuit combined-cycle plant, it is proposed to perform double resuperheating of water vapor in the high pressure loop (intermediate superheater ISH-1) and in the cooler part of the heat recovery boiler (intermediate superheater ISH-2). It was found by calculation that the implementation of the double reheated steam at high pressure and the tail of the WHRB increases the electrical efficiency of PGU-420 by 0.92 % compared to the option of a single resuperheat (from 60.45 to 61.37 %). The capacity of PGU-420 increases by 3.7 % (from 422.94 to 438.61 MWt). The specific reference fuel consumption is reduced by 1.5 % (from 203.47 to 200.42 g/(kWfh)). The steam dryness factor increases by 6.03 % (from 93.2 to 99.23 %). The steam turbine efficiency increases by 1.15 % (from 36.26 to 37.41 %), and steam turbine power increases by 11.61 % (from 134.94 to 150.61 MWt). The economic effect of the implementation of the second water vapor resuperheating in monetary terms is 48.0 million rubles per year when the cost of fuel equivalent is 3700 rubles/t. f e. and at the operating time of 7500 h/year.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.