Abstract

Pad construction costs can affect the overall economics of heap leach projects. Costs for single- and double-lined pads, using various designs, are listed for a typical small and large project. Double-lined pads are now frequently required by regulatory agencies. Unless such designs significantly reduce the risk of site-specific contamination, the extra costs cannot be justified from an economical viewpoint. Specific attention is given to the short project life (typically five years) of heap leach projects. A few numerical examples are presented to demonstrate the overall impact of these costs on economic parameters.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.