Abstract
This paper presents a brief history of earth and rock-fill clams, including a discussion of the types of failure to which such clams have been subject. General features of projects are covered including outlet conduits, spillways, riprap, and the earth embankment itself. Since, in many instances, adequacy of the appurtenant works determines the safety and economy of a project, these features are discussed. Best current practice in design and construction is described with detailed reference to slope stability, slope protection, cutoff and core walls, earthquakes, costs, maintenance, and grouting. Predictions of future advances are set forth, and helpful design criteria are outlined. An extensive Bibliography adds materially to the over-all value.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Transactions of the American Society of Civil Engineers
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.