Abstract

The performance of a container terminal depends on many aspects of operations. This paper focuses on the optimal sequencing of a yard crane (or YC for short) for serving a fleet of vehicles for delivery and pickup jobs. The objective is to minimize the average vehicle waiting time. While heuristic algorithms could not guarantee an optimal solution, a conventional mathematical formulation such as mixed integer program would require too much computing time. We present two new algorithms to efficiently compute YC dispatching sequences that are provably optimal within the planning window. The first algorithm is based on the well-known A ∗ search along with an admissible heuristics. We also incorporate this heuristics into a second backtracking algorithm which uses a prioritized search order to accelerate the computation. Experimental results show that both new algorithms perform very well for realistic YC jobs. Specifically, both are able to find within seconds optimal solutions for heavy workload scenarios with over 2.4 × 10 18 possible dispatching sequences. Moreover, even when the vehicle arrival times are not accurately forecasted, the new algorithms are still robust enough to produce optimal or near-optimal sequences, and they consistently outperform all the other algorithms evaluated.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.