Abstract

In automated container terminals, containers are transported between ships and storage yard by differen types of vehicles, for example, guided vehicle (AGV, yard crane (YC) and quay crane (QC). To improve the productivity of the automated container terminals, it is important to harmoniously synchronize operations of different types of container handling equipment. This paper examines the scheduling problem of all handling equipment in an integrated way by utilizing information about yard storage locations for the loading operation in an automated container terminal. A mixed integer programming (MIP) model is developed. As the optimization software can only be used to solve small size problems, we develop a genetic algorithm (GA) to obtain approximate optimal solutions for large size problems. Computational results demonstrate the benefits of integrated model and the effectiveness of the proposed algorithm.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.