Abstract

Relying on the project of the open‐cut municipal tunnel undercrossing Ankang Freight V yard, the train dynamic response and seismic response of ultrashallow‐buried rectangular tunnel of the lower interchange are studied, respectively, by combining the method of field measurement and numerical simulation. The results show that under the action of train vibration load, the dynamic stress response of the top plate midspan and the upper end of the side wall of the tunnel cross section directly below the rail is the most significant, and the dynamic stress response of the bottom plate is the smallest. Under the rare earthquake, the tunnel structure has large transverse deformation, in which the transverse displacement of the tunnel roof is the largest. At the same time, there is a large stress concentration at the variable section of the tunnel.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.