Abstract

In this paper, the impact of integrating a 6MW solar PV plant installed in Zaouiet Kounta (Wilaya Adrar), in southwest Algeria into a medium voltage network during transient conditions is analyzed. This network is fed by two sources, either a grid source or a conventional power plant if a grid source is not available. Three different transient circumstances are considered in this analysis. The impact on voltage and frequency at the network’s main busbar as well as generator rotor angle is investigated. The analysis is carried out on the network by using ETAP software. The analysis results showed that the integration of this PV plant has an adverse effect on network performance during transient conditions when a Conventional power plant is used to feed network. Moreover, it has a slight effect on main busbar voltage when a grid source is used to feed network.