Abstract

The construction period of large cable-stayed bridges is long, and the structure deformation is complicated. Any error during construction will potentially affect the cantilever alignments and the internal forces. In order to ensure safety during construction and exactly determine the cantilever alignments, dynamic deformation monitoring is needed immediately when the construction of the superstructure starts. This paper aims at the requirement of deformation monitoring during the Sutong Bridge construction, and introduces the realization and observing schemes of the GPS and georobot based on remote real-time dynamic geometrical deformation monitoring system, then researches the data processing methods and enumerates some of the application achievements. Long-term operation during the Sutong Bridge construction indicates that the system runs steadily and the results are reliable.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.