Abstract

In this paper, we consider common due-window assignment and scheduling problems with general position-dependent processing times involving deteriorating and compressible maintenance activity on a single machine. Two models associated with maintenance activity are examined in this article, in which the maintenance length is assumed to be either time-dependent and compressible or position-dependent and compressible. The objective is to find jointly the location and size of due-window, position of maintenance as well as resource amount allocated to it, and job sequence to minimise a total cost function based on earliness, tardiness, window location, window size and resource cost. We show that the problem considered in each of the two models’ setting can be optimally solved with polynomial time algorithm by reducing to assignment problem. Finally, two examples are provided to illustrate the solution procedures.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.