Abstract

_ This article, written by JPT Technology Editor Chris Carpenter, contains highlights of paper OTC 31413, “Applying Downhole Sand Control for High-Rate Gas Completions in Deepwater Malaysia,” by Elvy Jose Samuel, SPE, Mohd Faizal Yusoff, and Phil Bee, PTTEP, et al. The paper has not been peer reviewed. Copyright 2022 Offshore Technology Conference. Reproduced by permission. _ Designing and delivering a successful completion in a subsea high-rate gas deepwater environment is a great challenge in upstream field development. The complete paper covers the sand-control design and execution techniques applied to four high-rate gas wells in the operator’s Block H development in the deepwater region of Sabah offshore Malaysia in 2020 and 2021. Field Background PTTEP’s Block H gas development is a multifield phased subsea development designed to deliver gas to Petronas’ floating liquefied natural gas (FLNG) project known as PFLNG2. The Block H field is in the South China Sea in water depths between 1150 and 1400 m. The first phase (Phase 1A) of the project was executed in four wells between the Rotan (three wells) and Buluh (one well) fields in the midsection of the Block H development. The reservoirs completed in Phase 1A were deepwater slope turbidite sands deposited during the Late Miocene and contain high net-to-gross reservoirs. Based on evidence from sonic logs and rock-mechanics testing performed on rotary side-wall cores and fullbore cores, all targeted reservoirs required robust sand control. Openhole gravel packing (OHGP) was chosen as the recommended sand-control technique for the high-rate gas application, and the four wells were drilled nearly vertically, with high water standoff height as a mitigation against early water coning. The drilling and completion operations were completed in a batch completion strategy in which all top holes were drilled to the top of the targeted reservoir, followed by the batch completion of all wells’ lower completion phase, then the batch upper completion and well cleanups. The wells were placed on production in Q1 2021 to PFLNG2, achieving the targeted rates per well of 80 MMscf/D solids-free.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.