Abstract

In the application of central station power to coal mines the successful operator of today is sometimes at a loss to know just what saving will be effected, for the following reasons: first, he believes that he is producing power at a fairly low cost, due to cheap fuel, simple apparatus and low cost of buildings; second, hot knowing approximately his costs in detail, he is at first unable to see his saving, if any, as compared with a definite rate per kw-hr. for central station power; third, the use of central station energy often requires the purchasing of new apparatus, and the selling of the present generating apparatus under unfavorable conditions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call