Abstract

In the paper, some of the assertions in the editorial entitled “Do you manage work, deliverables or resources” of the recent April issue of the International Journal of Project Management are questioned. Here it is maintained that the WorkBreakdown Structure (WBS), is an essential instrument for Project Management and that it should not be considered as the result of the marriage of the ProductBreakdown Structure (PBS) and the Organization Breakdown Structure. WorkPackages are important for integration of the corners of the Iron Triangle. Next, to illustrate this, purpose and composition of both WBS and PBS are elaborated upon. Using PBS and WBS as a stepping-stone, this paper concludes by putting the project management concept in the broader perspective of the generalized requirement for ‘trees’ as instruments for project management. The larger, the more complex the project, the more galaxies of project variables will strain project management. Redressing of such galaxies into hierarchically structured trees will then be necessary for project management to remain on top.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.