Abstract
Work breakdown structure is a generic term for a number of different breakdown structures such as product breakdown structure and cost breakdown structure (CBS); it can also have a specific meaning for work carried out on a product. These differences are discussed in detail in this chapter, including the use of the CBS as a tool for estimating. Diagrams are provided which show the hierarchy of each breakdown structure. Also discussed are the organization breakdown structure and its related responsibility matrix.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have