Abstract

Reactive power generation has been commonly used for power loss minimization and voltage profile improvement in power systems. However, the opportunity cost of reactive power generation should be considered since it affects the frequency control capability of the generator to some degree. This paper proposed a distributed nonlinear control based algorithm to achieve the optimal reactive power generation for multiple generators in a power grid. The reactive power control setting update for each generator only requires local measurement and information exchange with its neighboring buses. It is demonstrated that the proposed algorithm can reduce the non-convex objective function monotonically till convergence and achieve comparable solutions to the centralized technique: particle swarm optimization with faster convergence speed. The proposed algorithm has been tested on the IEEE 9-bus, 39-bus and 162-bus systems to validate its effectiveness and scalability.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.