Abstract
Aiming at the scheduling optimization problem of the regional electrical integrated energy network under the background of the dual carbon target strategy, on the premise of ensuring the balance and stability of the IIES energy side supply, an optimization solution method for the regional electrical-gas integrated energy network scheduling considering carbon trading was proposed. Based on the priority model of building multi-energy equipment, and taking the minimum sum of the output cost of energy production, the cost of energy conversion, and the carbon transaction cost caused by net carbon emissions as the objective function, the daily optimal scheduling of the regional electrical integrated energy network was established. The model realized the optimal solution of the output value of different energy forms. Utilizing simulation technology, the objective function values of the unit carbon tax price of 8.32$/t, 24.79$/t, and 46.94$/t under the specific scenario of IIES were discussed. The scenario with the optimal objective function (unit carbon tax price of 24.79$/t) was further compared. In addition, the real-time output value of multi-energy equipment was analyzed when the network scheduling optimization was optimized.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have