Abstract

The operation mode of energy storage heat storage electric boiler under time-of-use (TOU) electricity price is studied in this paper. According to the physical characteristics of energy storage heat storage electric boiler, the optimal operation model under the existing system of TOU electricity price is established, which takes the minimum cost of electricity in the study period as the goal, The multi-agent simulation system and the interaction mechanism of the energy storage heat storage electric boiler under the optimized operation model are designed. Finally, we take a typical energy storage heat storage electric boiler user as an example. The operation mode of energy storage heat storage electric boiler can be changed by the incentive effect of TOU electricity price. The result shows that changing the operation mode of the energy storage air conditioning reduce the cost of electricity, and achieve the purpose of smooth load curve.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.