Abstract

The aim of the paper was to provide information on construction deficiencies of storage facilities Libuš Business Park. The whole area used for storage with administrative parts. The buildings of the halls are two with different constructions: Building number 1 is a reinforced concrete skeleton with prestressed roof panels (ceiling) and brick filling and Building number 2, which sandwich panels PUR system solutions. The study of the situation and the subsequent construction and can again be used without problems in order to avoid further damage to the goods and repeated defects. Alternatively, suggest other procedures (remediation). This was mainly a failure of the supporting truss of the object 1 and the failure of the floor and the roof of the object 2.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.