Abstract

Nowadays, the effects of the development of electric power are becoming more and clearer in the development of national economy, and it influences the increased speed of GNP. The generated construction of Electric Power Industry for our country is not very appropriate, and there are a long distance to the international level. First, it discusses the marco-circumstance, the thought of sustainable development and the practical situation of china. At last, this article puts forward the difficult which our country facing and gives some feasibility methods.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call