Abstract
This study was based on the problems existing in the hydropower unit reliability assessment. Through the discussion of the ways and methods of hydro turbine reliability evaluation, and the reliability evaluation index, some proposals are provided to improve the reliability management level of hydropower enterprises.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.