Abstract
An essential criterion for a disassembly system is the benefit it brings, that is the revenue brought by the retrieved parts and material, decreased by the cost of their retrieval. In the recycling industry the main problem is the uncertainty that occurs during the disassembly operations. A fast scheduling algorithm is proposed so as to optimize the income flow of the disassembly system taking into account alternative destructive operations. Two examples from industry are given.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.