Abstract

To solve the problems of low efficiency and insufficient dynamic response of job shop scheduling in the discrete manufacturing process, a multi-objective flexible job shop scheduling model for digital twin and its solution method are proposed. Firstly, a digital twin scheduling model with physical entity, virtual model and production plan is constructed, and four factors are taken as optimization goals. Then, a hybrid particle swarm optimization method is designed to increase the refined optimization ability, and the obtained Pareto optimal solution set is analyzed by grey relational analysis to obtain a satisfactory solution which coincides with the actual production. Finally, a three-dimensional model which is completely mapped with the real job shop scheduling is built by Plant Simulation software. The scheduling process is simulated and optimized by combining with the production data of an enterprise, which verifies the feasibility and applicability of this method, and will effectively guide the production practice.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.