Abstract

The use of digital models has increased significantly in recent years with the accessibility of fast computing machines. A variable dimensioned digital model was constructed for the Shadnagar granite basin using SPECTRUM-7 micro computer to integrate various hydrogeological characteristics and for their quantitative evaluation. The basin has an areal extent of 437 sq km and is demarcated with clear water divides in all directions. Transmissivity, recharge and discharge at each cell of the basin area were estimated by trial and error simulation of the hydrogeological phenomenon under steady state condition. Dynamic simulation at representative nodes facilitated the estimation of storage coefficient. The capability of the constructed model was established by the conformance of the simulated hydrographs with the actual behaviour of the ground water system. The entire studies ammended the earlier arrived estimates of various input/output hydrogeological parameters and evolved a methodology for efficient processing of aquifer simulation data

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call